If needed to cross sidewalks, dig the trench down to the needed depth on either side, then bore a lateral gap beneath the sidewalk by driving a piece of rigid pipe or conduit horizontally. Then, operate the conduit beneath the sidewalk from the gap you bored. The Roxtec BG™ B https://cablemanagement79011.thenerdsblog.com/34895488/a-secret-weapon-for-cable-management