1

About residential 7.7kw solar system installation wa

News Discuss 
Ten months ago I've experienced no concerns using this type of organization. The panel and inverter installation system went quite effortlessly. No roof tiles had been damaged. The complete installation took about 3 hrs. To this point, I'm really proud of the items used. We check with Each individual installer https://citypointsolar.com.au/6-6kw-solar-system-installation-perth/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story